I do commercial refrigeration for a living. Think supermarkets. Anyhow we were set to install the refrigeration for a Super Wal-Mart last year when we got a call that the project would be delayed for 9 months minimum. Generally the refrigeration contractor is allowed into the building after the concrete slab is poured. But we knew the slab had been poured on this particular job so we were wondering what the hell the hold up was. We later found out the reason. After the slab and all its stub outs of plumbing and electrical conduit had passed inspection the Wal-Mart appointed overseer of construction comes in the building and goes over to the plumber and says yeah that's nice and all but *flips the plumbers plan 180 degrees* that's how it should be. There was one page in that entire set of drawings that read top to bottom rather than bottom to top. That plan was the plumbers. They had plumbed the ENTIRE BUILDING BACKWARDS. 5 acres of concrete slab had to be torn up and removed. The plumber lost his business. Talk about a monumental oversight. PromethiumX fucked around with this message at 14:38 on Sep 11, 2011 |
# ¿ Sep 11, 2011 14:34 |
|
|
# ¿ Apr 28, 2024 21:43 |
|
Blistex posted:Sounds like the overseer should have lost his job as well. And so should the GC.
|
# ¿ Sep 11, 2011 15:37 |