|
Orvin posted:Well, there is one way to get it done by 2025. Just shut it all down. Not a realistic approach, but definitely a possible solution. I uh have a lot of experience and information in the same realm (MISO/PJM) and I uhhhh......agree lol
|
# ¿ Sep 20, 2021 00:01 |
|
|
# ¿ May 20, 2024 10:32 |
|
Huh. I thought the US South/plains wouldn't start hitting grid capacity scenarios/warnings until July at the earliest.
|
# ¿ Jun 13, 2022 22:02 |
|
to be fair, "2 years for parts" is becoming more common by the month in the world of power transmission. I've never seen anything like it. Every company is begging for spares from everyone else, and tons of critical parts have backorder estimates I've never seen anything close to before.
|
# ¿ Jan 10, 2023 01:02 |
|
My system has numerous 138kv transformers in service right now that were built and commissioned in the 1920s. And countless transformers/breakers that went online in the 40s and 50s. This stuff can last a long time if properly monitored and maintained.
|
# ¿ Jan 11, 2023 02:59 |
|
Dameius posted:Anything involving crypto is a waste, a scam, or both.
|
# ¿ Apr 30, 2023 02:01 |
|
|
# ¿ May 20, 2024 10:32 |
|
I'm not even sure what a 100% renewable grid would look like or be operated. Hydro is only available in select locations (and climate change will significantly change the conditions), and wind/solar can't ramp up or down and provide no frequency stability or inertia to the grid.
|
# ¿ Jun 14, 2023 22:40 |