He has another job that may get confirmed that may be higher margin for him, but hasn't confirmed it, so he's slow-playing you to see what happens with the other job.
|
# ¿ May 12, 2016 13:53 |
|
|
# ¿ May 6, 2024 08:21 |
|
Gounads posted:Trying to compare the bids line by line is impossible. First, they're grouped very differently. But even when I combine things to get comparable lines, one has electric and plumbing -50% but then framing +50%, foundations are nowhere near each other. It's just all over the place. I don't understand how line-items can be so far apart but the total so similar. Well, what are you negotiating for? Are you negotiating to try and feel like you got some money off? Do you think the prices are too high? Are you negotiating for certain finishes? Negotiating for the sake of saying you negotiated can often be a waste of time on both ends.
|
# ¿ May 13, 2016 17:22 |
|
Did you happen to check into the difference between poured and post-insulated versus insulated form? I've always wondered how much more expensive it is here in Massachusetts; we've toyed with building and I was curious.
|
# ¿ Nov 22, 2016 17:39 |
|
I've always wanted to ask this question about Australian wiring: are those breakers all wired in or do they clip into a bus bar in the load center? For the longest time I've assumed those are just DIN rail mount breakers, but that would mean that everything is wired onsite inside which I would have thought would go away to reduce install costs.
|
# ¿ Jun 19, 2017 15:01 |