Builded me a patio in the summer: 1. The planning. Estimated the pavers and base material using areas, but counted the wall blocks because they're not cheap. Thanks Sketchup. 2. The digging. All by hand because I figured renting a digger would have cost more money in the long run taking into account lawn repairs. 3. The Laying. Base, then bricks, then more base, then more bricks. 4. Presto-changeo, done! Gave it a splash of water for this pic for that glossy centerfold look. I made sure to make a deep and compact base, so I hope the frost doesn't move it too much. All in all, it was about 8 man-days in work (Thanks, bro).
|
# ¿ Jan 3, 2009 21:31 |
|
|
# ¿ May 5, 2024 19:30 |
|
Not an Anthem posted:Nice, but is the drain spout running down that step going to push out sand or filler? That's very classy.
|
# ¿ Jan 4, 2009 03:36 |